Carl Zeiss Dragon project

Construction time:To be decided locations:Waigaoqiao, Shanghai

The plant site of the project is located at Shanghai Waigaoqiao free trade zone. Total land occupation area of the plant is about 21,118m2. Total floor areais 16,398m2. Main buildings include a main production building, two gatehouses, a fire pump room and pool.

Related news:
Last one:
Next article:
小蝌蚪视频.WWW-小蝌蚪视频www在线观看-小蝌蚪app-小蝌蚪视频污污